Single Position
One self-contained staffed workstation with its own passenger-facing counter and working side.
Confirm: Staff entry + device depth + service clearance
AIRPORT / CHECK-IN COUNTERS
Start with the workflow. Then shape the counter.
Custom solid-surface check-in counters coordinated around operator workflow, equipment interfaces, baggage systems and approved terminal layouts.
PRODUCT COLLECTION
Open a product to review its form and available project information.
8 products
CHOOSE A STARTING POINT
Start with the working arrangement. Dimensions and interfaces follow your approved terminal layout.
One self-contained staffed workstation with its own passenger-facing counter and working side.
Confirm: Staff entry + device depth + service clearance
Two neighbouring staffed workstations coordinated as one counter arrangement.
Confirm: Operator space + drawer travel + module connection
Multiple staffed positions aligned along one service line, with coordinated module joints.
Confirm: Position spacing + floor services + transport splits
Configuration concepts. Final furniture follows approved project drawings.
| Configuration | Start here when | Resolve first |
|---|---|---|
| Single Position | One staffed service point needs independent operator access and equipment space. | Confirm staff entry, device depth and panel-opening clearance. Coordinate any specified baggage interface separately. |
| Paired Positions | Two operators work side by side and their equipment and storage must coexist. | Check separation between workstations, drawer and service-door travel, joint location and power/data entry. |
| Linear Counter Bank | Several staffed positions must work as one row while each remains serviceable. | Confirm position spacing, access to every module, floor-service points, packed sizes and site joint sequence. |
These are starting configurations, not fixed sizes or performance guarantees.
YOUR EQUIPMENT SETS THE BRIEF
Confirm equipment size, mounting points and removal clearance.
Plan entry points and accessible routes clear of the operator.
Keep service panels clear of adjoining modules and fixed equipment.
Confirm the counter edge and clearances with the baggage-system supplier.
YHS supplies the furniture package. Airport equipment and systems remain with the appointed suppliers.
VISIBLE SURFACE
Agree colour, finish and edge profile against the approved sample.
Design concept
SUPPORTING ASSEMBLY
Select the substrate and supporting assembly around spans, equipment loads, fixings and service access. Confirm materials and sections on the approved drawing; one build-up does not apply to every counter.
Design concept
MODULE + PROTECTION
Plan packed sizes around site access and the agreed assembly sequence.
Design concept
A change to the finish can affect the edge, joint and support detail. Confirm them together.
Send the configuration you are considering, the current layout and any equipment information available. A complete technical specification is not required for the initial review.
Missing information is identified during the initial review.
Let's review the furniture scope and the interfaces still to confirm.
Design concept · Images illustrative · Final specifications follow approved drawings.