S01 / CUSTOM SOLID SURFACE RECEPTION FURNITURE

Reception furniture
built around arrival.

Coordinate the first impression with staff workflow, equipment, brand details and the route into the building.

reception application concept.
Application concept
YHS PROJECT LOGIC / RECEPTION

Arrival×Staff workflow×Brand detail×Delivery

S02 / PROJECT INTENT

Plan both sides
of the first impression.

Visitor arrival, staff use and brand details belong in one coordinated plan.

A reception desk connects the visitor’s arrival with the staff’s working plan.

01

Arrival + handover

Locate the greeting point, queue and document exchange without obstructing entrance doors or lift lobbies.

02

Occupied working space

Overlay staff positions, monitors, open drawers and shared equipment before fixing the footprint.

03

Service + brand coordination

Keep staff entry and replacement access clear. Coordinate artwork, lighting and finish on the same elevation.

L — overallD — usable01020304VISITOR APPROACH
01Staff position02Drawer travel03Staff entry04Handover
Coordination concept · Not to scale. The project plan defines service levels, accessibility provisions and usable dimensions.
S03 / CRITICAL INTERFACES

A clean frontage.
A working side that works.

What must be confirmed before this can be manufactured correctly?

working-side coordination concept: monitor, cable entry, joint and support.
Working-side concept
INTERFACE MAP / 01–04Confirm in the shop drawing
01Equipment + handover

Confirm the visitor task, monitor sightline, device footprint and handover level with the operations and IT teams.

Freeze: equipment model + mounting zone.
02Power, data + service access

Locate building connection points, cable entry and removable panels. Check access after storage is installed.

Freeze: cable route + service responsibility.
03Finish + joint alignment

Coordinate the visible joint, logo scale and lighting line with the approved material sample and elevation.

Freeze: finish sample + coordinated elevation.
04Support + usable space

Resolve the support, fixing and service cavity around staff use and equipment.

Freeze: support detail + maintenance route.

Coordination concept. Actual equipment, support, joints and service provisions follow the approved project detail.

S04 / BUILD ANATOMY

Surface. Support. Service.

The visible face and supporting assembly must be resolved together.

01020304
01Solid-surface shell02Local backing03Project support04Removable panel
Assembly concept · Open working bay illustrated. Backing, support and connections are project-specific.
01

Surface + visible details

Approve the material sample, edge profile and joint position. Finish and pattern choices affect the visible detail.

02

Backing + support zones

Select backing and support for the actual span, loading and fixing. Preserve knee space and equipment bays.

03

Storage + service access

Coordinate cabinet opening, panel removal and equipment replacement before the supporting assembly is released.

S05 / PROJECT RISK MAP

Resolve the decisions
that become site changes.

Keep the risk, consequence, control point and evidence connected.

01Brand approval on separate revisions
Risk

Artwork and lighting are approved separately from the furniture elevation.

Project consequence

Fixings, openings or light lines may miss the intended alignment.

YHS control point

Coordinate artwork, finish, lighting and service access on the released elevation.

Evidence required

Approved elevation + artwork/lighting detail.

02Equipment selected after openings are cut
Risk

Final hardware models are missing at fabrication release.

Project consequence

Equipment may not fit or remain accessible for replacement.

YHS control point

Keep affected openings pending until the model, mounting dimensions and service clearance are approved.

Evidence required

Equipment schedule + released drawing + relevant fit-check record.

03Arrival plan stops at the front elevation
Risk

The greeting point is fixed without queue, doors or staff entry.

Project consequence

Visitors and staff circulation can conflict.

YHS control point

Review the marked arrival and occupied working plan before freezing the footprint.

Evidence required

Arrival plan + working layout + service-position approval.

04Modules fixed before the site route
Risk

Receiving floor, handling route or installation window is unresolved.

Project consequence

The module may not reach the room or the agreed installation period.

YHS control point

Resolve packed dimensions, weight, joints and handling before module release.

Evidence required

Route survey + module/packing plan + agreed site responsibilities.

Agree the approval owner and release revision for each control point. The listed records are required evidence, not records supplied by these concept illustrations.

S06 / PROOF / PROJECT RECORDS

Connect the detail
to the record.

Link manufacture, checks and delivery to the approved drawing.

General workshop process reference .
General process reference

General workshop reference. It does not replace the project records for your selected desk.

For your selected desk, request records that can be traced to its scope and drawing.

01

Drawing + release

Furniture layout, coordinated interfaces, approval owner and the revision released for manufacture.

02

Finish + visible detail

Material sample, joint/edge detail, logo artwork and lighting access linked to the approved elevation.

03

Fit + access checks

Relevant checks against the actual equipment model and approved drawing.

04

Packing + site route

Packed module dimensions, gross weights, handling route and agreed installation responsibilities.

Records to request for the selected desk · Confirm availability within the agreed project scope.
S07 / BEFORE WE BUILD

Freeze the selected detail.
Then release manufacture.

These are production-release decisions. You can start an initial review before they are all complete.

01

Task + layout

Arrival, handover, staff positions and project-required service provisions.

02

Site dimensions

Furniture footprint, wall/floor junctions, doors and fixing conditions.

03

Material + brand

Approved sample, edge/joint detail, artwork and lighting elevation.

04

Equipment + utilities

Final models, mounts/openings, power/data entry and approval owners.

05

Working side + access

Knee space, storage travel, staff entry and equipment replacement.

06

Modules + delivery

Released revision, module breaks, packed route and installation window.

Agree the approval owners.

Project team: site, equipment and finish approvals. Furniture scope: fabrication detail and module plan. Site trades: utilities, handling and installation. Confirm the actual responsibilities in the project scope.

DELIVERY IS A DESIGN INPUT

A desk that fits the room
must reach the room.

Plan module breaks around the entire building route, joint appearance and site assembly sequence.

01 / Ground floor + receiving

Confirm unloading responsibility, door openings, corridor turns and the final room approach against packed size and gross weight.

02 / Upper floors + elevator

Provide clear door width/height, cabin width/depth/height and rated load. Include the handling equipment in the route review.

03 / Stairs + turning space

If stairs are required, provide clear stair width, landings, turning/corner dimensions and headroom. Agree handling limits, method and responsibility.

04 / Site assembly + installation window

Agree module order, fixing, local joint work, utilities connections and surface protection with the site team.

S08 / READY TO QUOTE

Bring the brief.
Start with what you have.

Share the arrival brief, a sketch or a reference image. The first review can identify the furniture scope and the coordination points still to resolve.

Final equipment and production details can be resolved during project review.

ENOUGH TO START AN INITIAL REVIEW
  • Reference image, sketch or available drawing
  • Application + approximate size / quantity
  • Project location + receiving floor
  • Target installation date + known constraints
What must be confirmed before production?

Approved drawings and revision; actual dimensions; material/finish; equipment and utilities; module and packing plan; site access and installation responsibilities.

Initial estimates should identify assumptions and exclusions. Fabrication follows the confirmed project scope.