YHS PROJECT INSTALLATION SUPPORT

Installation Guide

General preparation and coordination guidance for custom reception desks and commercial solid surface furniture.
Review component identification, site preparation, positioning, modular assembly, surface protection and final inspection before installation. Final installation must follow the approved shop drawings, product structure, site conditions and local project requirements.
Approved Drawings
Component Identification
Surface Protection
Remote Guidance
Installation Guide
1

Installation Overview

Review the approved drawings, component list, site conditions and installation responsibilities before starting. Protect all finished surfaces and coordinate structural, electrical and plumbing work with qualified trades where applicable.

Verify Components

Check quantities, labels and visible transport condition.

Protect Surfaces

Use suitable padding during handling and assembly.

Confirm Site Conditions

Review access, floor level, wall condition and interfaces.

Follow Approved Drawings

Use approved dimensions, divisions and connection details.

Tools and Preparation

Measuring Tape

Spirit Level

Suitable Drill and Bits

Approved Fasteners

Clamps

Surface Protection Pads

Soft Cleaning Cloths

Personal Protective Equipment

Confirm the final tools, fasteners, sealants and installation method with the approved drawings and responsible contractor.

2

Pre-Installation Checklist

Verify all components, quantities and identification labels against the packing list.
Ensure the installation area is accessible, clean, dry and ready for work.
Confirm the supporting structure and approved installation interfaces are ready.
Inspect visible surfaces and components for transport damage before installation.
Check electrical, data, plumbing and equipment positions with qualified trades where applicable.
Protect completed floors, walls and furniture surfaces during positioning and assembly.
3

Step-by-Step Installation Process

1

Position and Level

Place the main units in the approved location and confirm orientation, clearance and level before connection.

2

Verify Approved Interfaces

Review the planned support, wall, floor and internal connection details before securing the units.

3

Connect and Align

Align adjoining modules carefully and connect them according to the approved structure and component identification.

4

Coordinate Joints and Finishes

Follow the approved joint, adhesive, sealant and finishing requirements for the selected materials.

5

Coordinate Equipment and Services

Confirm equipment positions, access panels, cable routes and specialist service connections with qualified trades.

6

Final Check

Review alignment, stability, visible joints, fittings, access panels and finished surfaces before handover.

Installation methods, joint treatment and service connections must follow the approved shop drawings and project requirements.

4

Safety Notes

  • Use suitable lifting techniques and adequate personnel for large components.
  • Wear appropriate personal protective equipment for the work performed.
  • Keep the work area clean, organized and protected.
  • Use qualified trades for structural, electrical and plumbing work.
5

Alignment and Finish Guidance

  • Confirm position and alignment before permanent connections.
  • Protect visible solid surface, wood, metal and decorative finishes.
  • Follow approved adhesive, joint and sealant requirements.
  • Remove temporary protection only after surrounding work is complete.
  • Record visible damage or dimensional conflicts before continuing.

Approved Materials and Joint Details

Adhesives, sealants, fasteners and finishing methods must match the approved product specification and supplier guidance.

6

Need Remote Support?

YHS Furniture can review component identification, approved drawing details and installation questions within the confirmed project scope.

WhatsApp +86 133 8038 9728
Email info@yhsfurniture.com
Contact Our Team Send Installation Question

16 Years

Manufacturing Experience

36

Employees

79

Countries Served

6,000+

Projects Delivered