S01 / BANK & FINANCIAL SERVICE FURNITURE

Bank furniture
built around
the service task.

YHS supplies custom acrylic solid-surface bank furniture made to approved project drawings. Coordinate service positions, selected devices and branch interfaces before production.

One furniture scope. Named equipment and specialist interfaces.

Bank branch application concept with a staffed counter and a consultation zone. No verified project is represented.
Bank branch application concept
S02 / SOLUTION ROUTING

Different service tasks.
Different coordination points.

Identify what happens at each position before selecting its furniture. These are service routes, not a list of finished products.

Layout concept · not to scale
01

Staffed service + handover

Locate documents, selected devices and staff positions around the approved service task. Identify any bank-required transaction opening or barrier with its responsible supplier.

Explore Furniture Options →
Layout concept · not to scale
02

Account opening + consultation

Coordinate seated exchange, document visibility and screen orientation. Conversation privacy also depends on the room and the operator’s service plan.

Explore Furniture Options →
Layout concept · not to scale
03

Selected-device service point

Start with the bank-selected device and its service envelope. Separate the furniture surround from equipment supply, software and commissioning.

Explore Furniture Options →
S03 / DESIGN INTENT + SERVICE PLAN

Protect the service plan.
Resolve the furniture.

  1. 01

    Keep the defining detail.

    Identify the frontage, contact edge, shadow line and material junctions that belong to the approved design. Compare a substitution using an edge-and-joint detail as well as its colour.

  2. 02

    Separate the service paths.

    Plot customer approach, occupied staff positions and document handover. Review queues and screen sightlines with the bank operator before fixing the frontage.

  3. 03

    Name the external interfaces.

    Mark device, IT, building and specialist requirements separately. Agree who supplies and approves each interface before it enters the furniture drawing.

Branch layout concept · customer approach, staff zone and equipment service route. Not an approved accessibility, privacy or security plan.
  • 01Customer approach + handover
  • 02Consultation + privacy review
  • 03Staff + equipment service route
Branch layout concept · customer approach, staff zone and equipment service route. Not an approved accessibility, privacy or security plan.
S04 / COORDINATED INTERFACES

A shared counter.
Separate responsibilities.

The furniture drawing needs agreed inputs from operations, equipment suppliers and the fit-out team.

Illustrative working-side assembly showing a monitor mounting point, cable entry, top joint and exposed supporting bay.
Working-side concept
01–04 / INTERFACE MAPIllustrative assembly · project-specific details
  1. 01

    Service plan → furniture positions

    The bank operator confirms tasks, handover zones and sightlines. YHS translates the agreed brief into counter positions and furniture details.

  2. 02

    Building services → accessible entry

    IT and fit-out teams define connection points. Coordinate cable entry and removable furniture access around the agreed equipment route.

  3. 03

    Design approval → edges + joints

    Link the selected sample, contact edge and visible joint to the same furniture revision. Review substitutions before releasing the affected detail.

  4. 04

    Selected devices → supporting detail

    Use supplier envelopes and agreed load information to coordinate furniture support. Rated barriers and specialist hardware need their own approved documents.

YHS’s furniture package and agreed installation provisions follow the quoted scope. Equipment, software, banking systems, specialist performance and commissioning are separately assigned.

S05 / MATERIAL + SUPPORT

Finish and build-up.
One coordinated drawing.

A sample establishes the visible finish. The furniture detail establishes what supports it and how it meets adjacent work.

Illustrative assembly · selected substrate, reinforcement and connections follow the approved project detail.
  • 01Solid-surface finish
  • 02Selected backing / substrate
  • 03Project-specific support
  • 04Equipment + service cavity
Illustrative assembly · selected substrate, reinforcement and connections follow the approved project detail.
  1. 01

    Review the contact detail.

    Compare the chosen solid-surface sample with the specified edge, visible joint and surrounding materials. Confirm care against the material supplier’s guidance.

  2. 02

    Select the support for the span.

    Show the chosen substrate, required reinforcement and fixing method. Coordinate openings, knee space and service access rather than assuming one frame for every counter.

  3. 03

    Carry the detail into delivery.

    Locate module joints with the frontage and installation route. Name who carries out site connections, local joints and specialist installation.

S06 / RISK → CONTROL → RECORD

Make the conflict visible
before manufacture.

Three coordination failures worth resolving on the drawing, before they become changes in the branch.

01

The device fits. Its connections do not.

CONFLICT → CONSEQUENCE

The equipment body fits the bay, but plugs, door travel or the removal path remain outside it. Fixed openings may then need rework.

CONFIRM BEFORE RELEASE

Review the supplier envelope with connectors, access panels and the complete service path. Identify the model and the supplier approving it.

AGREE THE RECORD

Vendor interface drawing + coordinated bay detail; agree whether a drawing, template or available device will be used for the relevant check.

02

A shared frontage. An exposed screen.

CONFLICT → CONSEQUENCE

Positions fit the counter, but a queue or adjacent customer can see documents or a screen. Furniture height alone cannot resolve every privacy requirement.

CONFIRM BEFORE RELEASE

Review sightlines and document handling with the operator. Compare screen orientation or consultation location before fixing the furniture geometry.

AGREE THE RECORD

Operator-reviewed layout + relevant elevations; acoustic and security requirements remain with the responsible project parties.

03

One module. A narrower route.

CONFLICT → CONSEQUENCE

The counter fits the final position, but the packed module cannot turn through a corridor or fit the receiving lift. A late split changes joints and assembly.

CONFIRM BEFORE RELEASE

Check the packed size and handling allowance against the surveyed route. Agree module breaks, local assembly and installation responsibilities.

AGREE THE RECORD

Route information + module and packing plan + agreed installation window.

Agree which records are required and available for the project. Illustrations do not establish device compatibility, security performance or accessibility compliance.

S07 / GENERAL WORKSHOP + PROJECT RECORD

Keep one furniture basis.
Record each branch change.

Agree the records that make the selected furniture scope clear for this branch and any later order.

General YHS surface-finishing reference, not a verified bank counter.
General YHS workshop reference

Surface detail

General YHS preparation reference, not a verified bank counter.
General YHS workshop reference

Preparation + assembly

General YHS packing reference, not bank-specific delivery evidence.
General YHS workshop reference

Module protection

These photographs show separate general workshop activities. A verified matched bank project and its approved records have not been supplied.

  1. 01

    Approved furniture basis

    Agree the service layout, drawing revision, finish reference and furniture scope to be released for production.

  2. 02

    Named supplier inputs

    Identify device models, interface drawings and any specialist documents used to develop that revision.

  3. 03

    Relevant checks + dispatch detail

    Agree the feature, check method and record required. Link module identification and packed sizes to the delivery plan.

FOR ADDITIONAL BRANCHES

Keep the reference.
Record the branch changes.

A repeat design still meets a different site. Agree what can be reused and what needs a new approval before reordering.

01 / REFERENCE

Furniture detail, finish and agreed scope

02 / SITE VARIATIONS

Devices, footprint, access and local interfaces

03 / RELEASE

Approved changes and the revision for this branch

S08 / START NOW · CONFIRM BEFORE RELEASE

Start with the branch brief.
Confirm one release revision.

Incomplete information can begin a review. The production drawing still needs the agreed decisions.

Useful first inputs

  1. 01

    Service brief

    Staffed service, consultation or selected-device positions; expected staff use and customer approach.

  2. 02

    Available branch plan

    Footprint, staff-only access, surrounding walls and floors, plus any operator-required service section.

  3. 03

    Equipment + responsibilities

    Known models and supplier drawings; identify who approves devices, specialist interfaces and site connections.

  4. 04

    Finish + delivery conditions

    Design references, target quantities, receiving route and the permitted fit-out period.

BEFORE PRODUCTION

Confirm one coordinated revision.

  1. 01

    Service + furniture layout

    Working positions, customer approach and operator-required privacy or service details.

  2. 02

    Devices + scope owners

    Supplier envelopes, openings, connections and specialist responsibilities.

  3. 03

    Finish + assembly detail

    Samples, edges, visible joints, support and module connections.

  4. 04

    Route + installation scope

    Packed dimensions, handling route, local work and release revision.

S09 / PROJECT REVIEW

Bring the branch plan.
Resolve the furniture interfaces.

A service brief and an available layout are enough to begin. Include known equipment and site constraints; mark open decisions so they can be reviewed before quotation.

WHAT THE REVIEW COVERS
  • 01Service positions and furniture scope
  • 02Device and specialist interface owners
  • 03Missing information for an equivalent quotation
  • 04Branch-specific changes and delivery constraints